Facility acknowledgment for publications
All users are asked to submit information about their resulting publications to the FRIB Manager for User Relations (useroffice@frib.msu.edu). In the future, publication information will be entered on the FRIB Scientific User Portal.
To the extent possible, an acknowledgment of Federal support must appear in the publication of any material, whether copyrighted or not, based on or developed using FRIB resources, as follows:
- Acknowledgment: "This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics and used resources of the Facility for Rare Isotope Beams (FRIB) Operations, which is a DOE Office of Science User Facility under Award Number DE-SC0023633.”
Users must submit their publication information to the DOE Energy Link (E-Link) System.
Traveling wave ion transport for the cyclotron gas stopper
'Electromagnetic Isotope Separators and techniques related to their applications' EMIS-16, Matsue, Japan
The NSCL Cyclotron Gas Stopper - Under Construction
'Electromagnetic Isotope Separators and techniques related to their applications' EMIS-16, Dec 2012, Matsue, Japan
The ReA Electron-Beam Ion Trap Charge Breeder for Reacceleration of Rare Isotopes
'Application of accelerators in research and industry': CAARI 22, Ft Worth, TX
The Superferric Gas-Filled Cyclotron Gas Stopper Magnet Design and Fabrication
ASC 2012, Applied Superconductivity Conference
FRIB, Its Challenge and R&D for that
16th International Conference on Accelerators and Beam Utilizations (ICABU 2012);Gyeongju, South Korea; Nov. 8-9 (2012)
Status of the FRIB Vacuum System Design
American Vacuum Society (AVS) 59th International Symposium and Exhibition; Tampa, FL USA,; Oct.28 (2012)
Iron Dominated 2 T Superconducting Dipoles for the Second Folded Segment of the FRIB Folded Linac
Applied Superconducting Conference at Portland, Oregon; Oct. 7-12, Vol. 23, P. 4000404 (2012)
The Superferric Cyclotron Gas Stopper Magnet Design and Fabrication
Applied Superconducting Conference at Portland, Oregon; Oct. 7-12, Vol. 23, P. 4101805 (2012)
FRIB Accelerator Beam Dynamics Design and Challenges
The 52nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB2012); Beijing, China; Sept. 17-21 (2012)
FRIB Technology Demonstration Cryomodule Test
Proceedings of LINAC2012; Tel Aviv, Israel; Sept. 9-14 (2012)
An Analytical Cavity Model for Fast Linac-Beam Tuning
LINAC 12 Conference; Tel-Aviv; Israel; Sept. 9-14 (2012)
Compact 4 kW Variable RF Power Coupler for FRIB Quarter-wave Cavities
Tel Aviv; Israel; September 9-14, 2012, 678-680. http://epaper.kek.jp/LINAC2012/papers/tupb093.pdf