Facility acknowledgment for publications
All users are asked to submit information about their resulting publications to the FRIB Manager for User Relations (useroffice@frib.msu.edu). In the future, publication information will be entered on the FRIB Scientific User Portal.
To the extent possible, an acknowledgment of Federal support must appear in the publication of any material, whether copyrighted or not, based on or developed using FRIB resources, as follows:
- Acknowledgment: "This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics and used resources of the Facility for Rare Isotope Beams (FRIB) Operations, which is a DOE Office of Science User Facility under Award Number DE-SC0023633.”
Users must submit their publication information to the DOE Energy Link (E-Link) System.
Antibody-based PET of uPA/uPAR signaling with broad applicability for cancer imaging
doi: 10.18632/oncotarget.12528
Towards Quantum Transport for Central Nuclear Reactions
doi: 10.1088/1742-6596/696/1/012010
Moments Method for Shell-Model Level Density
doi: 10.1088/1742-6596/665/1/012048
Developments in magnet modeling and beam optics for the ARIS separator at FRIB
doi: 10.1016/j.nimb.2016.01.029
A Cyclotron Magnet Case Study, would replacing the LTS Coils with HTS Coils make sense?
doi: 10.1109/TASC.2016.2515262
Ion source research and development at University of Jyvaskyla: Studies of different plasma processes and towards the higher beam intensities
doi: 10.1063/1.4934687
Limitation of the ECRIS performance by kinetic plasma instabilities (invited)
doi: 10.1063/1.4931716
Beam simulation studies of ECR beam extraction and low energy beam transport for FRIB
doi: 10.1063/1.4934621
Status of ECR ion sources for the Facility for Rare Isotope Beams (FRIB) (invited)
doi: 10.1063/1.4939643
Recent charge-breeding developments with EBIS/T devices
doi: 10.1063/1.4933033
ECOS-LINCE: A High-intensity Heavy-ion Facility for Nuclear Structure and Reactions
doi: 10.5506/APhysPolB.47.607
Beam commissioning of the SπRIT time projection chamber
doi: 10.3938/jkps.69.144